Country

Eid rush, rain cause 20km-tailback on highway

Vehicles on the Dhaka-Tangail highway remain stranded for four hours on Monday morning. The photo is taken from Mirzapur, Tangail. Photo: Star

Thousands of passengers have been facing untold sufferings on Dhaka-Tangail highway due to a 20-kilometre tailback caused by incessant rain and heavy pressure of vehicles ahead of Eid-ul-Azha since early morning.

The vehicular movement came to a halt totally around 5:00am, causing a huge traffic jam from Jirani point of Gazipur to Kurni in Mirzapur upazila of Tangail, reports our Tangail correspondent.

The traffic started to move slowly around 9:00am.

"The main reason behind the traffic jam was the heavy rush of cattle-loaded trucks on the highway ahead of the Eid-ul-Azha," Humayun Kabir, officer-in-charge of Gorai Highway Police outpost, told our correspondent.

Apart from this, the vehicles were moving very slowly due to the drizzle, the OC said.

The home-bound people have been suffering immensely on the highway for the last three days due to huge heavy traffic congestion.    

Comments

সংস্কারের প্রত্যাশার তুলনায় অন্তর্বর্তী সরকারের সময়সীমা যথোপযুক্ত না: আইন উপদেষ্টা

আইন, বিচার ও সংসদ বিষয়ক উপদেষ্টা ড. আসিফ নজরুল বলেছেন, সমাজে সংস্কারের জন্য যে প্রত্যাশা বা চাপ তৈরি হয়েছে, সেটার তুলনায় অন্তর্বর্তী সরকারের সময়সীমা ও সরকার কাঠামো খুব যথোপযুক্ত না। তাই সরকারকে...

৩ ঘণ্টা আগে