Today's Gallery (2017.03.0)

No, it's not the rainy season. Still, different points of DIT Road in the capital are waterlogged, thanks to digging and piling for the Moghbazar-Mouchak flyover construction. The work has damaged the sewerage system and as a result dirty water leaking from the lines flood the area. Such a mess has been affecting thousands commuting from Malibagh rail crossing to DIT Road for the last two months. Photo: Anisur Rahman
No, it's not the rainy season. Still, different points of DIT Road in the capital are waterlogged, thanks to digging and piling for the Moghbazar-Mouchak flyover construction. The work has damaged the sewerage system and as a result dirty water leaking from the lines flood the area. Such a mess has been affecting thousands commuting from Malibagh rail crossing to DIT Road for the last two months. The photos were taken yesterday. Photo: Anisur Rahman
A prison van taking 24 inmates from Dhaka Central Jail to Kashimpur Central Jail in Gazipur tipped over on Moghbazar-Saat Rasta flyover around 10:45am yesterday after its driver lost control. Part of the flyover remained closed for almost an hour until the van was towed away. Since no one was seriously hurt, the inmates were sent to Kashimpur on another van, according to Tejgaon Industrial Police. Photo: Star