Bangabandhu Bridge link road

Eid home rush: 15kms tailback on West, 20kms on East of Bangabandhu Bridge

A 15 kilometres long tailback was created on the west side of Bangabandhu Bridge in Sirajganj as number of North Bengal-bound vehicles increased on the highway ahead of Eid-ul-Fitr.

April 29, 2022
April 29, 2022

Eid home rush: 15kms tailback on West, 20kms on East of Bangabandhu Bridge

A 15 kilometres long tailback was created on the west side of Bangabandhu Bridge in Sirajganj as number of North Bengal-bound vehicles increased on the highway ahead of Eid-ul-Fitr.

push notification