Chattogram tunnel

96% of Bangabandhu tunnel completed

According to the project, two tubes having 35 feet wide, and 16 feet high have been constructed within an 11-metre gap so that heavy vehicles can pass through the tunnel easily.

February 9, 2023
February 9, 2023

96% of Bangabandhu tunnel completed

According to the project, two tubes having 35 feet wide, and 16 feet high have been constructed within an 11-metre gap so that heavy vehicles can pass through the tunnel easily.

push notification