Tk 3.80cr toll collected from the bridge in 24 hours
Road Transport and Bridges Minister Obaidul Quader today (July 12, 2022) blamed the traffic gridlock on highways ahead of Eid-ul-Azha on the “flawed management and lack of coordination”, not condition of the roads.
A 25km long tailback was created on the east side of Bangabandhu Bridge on the Dhaka-Tangail highway today (July 8, 2022) following huge pressure of vehicles on both sides of the bridge ahead of Eid-ul-Azha.
Tk 3.80cr toll collected from the bridge in 24 hours
Road Transport and Bridges Minister Obaidul Quader today (July 12, 2022) blamed the traffic gridlock on highways ahead of Eid-ul-Azha on the “flawed management and lack of coordination”, not condition of the roads.
A 25km long tailback was created on the east side of Bangabandhu Bridge on the Dhaka-Tangail highway today (July 8, 2022) following huge pressure of vehicles on both sides of the bridge ahead of Eid-ul-Azha.