Smaller rise in traffic through Bangabandhu Bridge
The improved transport network has now reduced the hauling time of vehicles and enhanced economic activity, boosting the national GDP, according to one estimate, to roughly one percent annually.
Road Transport and Bridges Minister Obaidul Quader today (July 12, 2022) blamed the traffic gridlock on highways ahead of Eid-ul-Azha on the “flawed management and lack of coordination”, not condition of the roads.
The Bangabandhu Bridge has set a new record in the amount of toll collected from vehicles in 24 hours till 6:00am today (July 8, 2022).
A 25km long tailback was created on the east side of Bangabandhu Bridge on the Dhaka-Tangail highway today (July 8, 2022) following huge pressure of vehicles on both sides of the bridge ahead of Eid-ul-Azha.
Although there was a pressure of vehicles on the Dhaka-Tangail highway, no traffic congestion were reported from anywhere.
A 15 kilometres long tailback was created on the west side of Bangabandhu Bridge in Sirajganj as number of North Bengal-bound vehicles increased on the highway ahead of Eid-ul-Fitr.
Railways Minister Nurul Islam Sujan says the government has taken an initiative to build a separate railway bridge beside the existing Bangabandhu Bridge on the Jamuna River.
A huge traffic gridlock is created on both sides of Bangabandhu Bridge as the computerised toll collection system of the bridge has broken down.
Smaller rise in traffic through Bangabandhu Bridge
The improved transport network has now reduced the hauling time of vehicles and enhanced economic activity, boosting the national GDP, according to one estimate, to roughly one percent annually.
Road Transport and Bridges Minister Obaidul Quader today (July 12, 2022) blamed the traffic gridlock on highways ahead of Eid-ul-Azha on the “flawed management and lack of coordination”, not condition of the roads.
The Bangabandhu Bridge has set a new record in the amount of toll collected from vehicles in 24 hours till 6:00am today (July 8, 2022).
A 25km long tailback was created on the east side of Bangabandhu Bridge on the Dhaka-Tangail highway today (July 8, 2022) following huge pressure of vehicles on both sides of the bridge ahead of Eid-ul-Azha.
Although there was a pressure of vehicles on the Dhaka-Tangail highway, no traffic congestion were reported from anywhere.
A 15 kilometres long tailback was created on the west side of Bangabandhu Bridge in Sirajganj as number of North Bengal-bound vehicles increased on the highway ahead of Eid-ul-Fitr.
Railways Minister Nurul Islam Sujan says the government has taken an initiative to build a separate railway bridge beside the existing Bangabandhu Bridge on the Jamuna River.
A huge traffic gridlock is created on both sides of Bangabandhu Bridge as the computerised toll collection system of the bridge has broken down.
A sub-inspector of Bangabandhu Bridge East Police Station in Tangail is suspended after transport workers block the road on the eastern side of the Bangabandhu Bridge for three hours bringing allegation that the SI assaulted a truck driver for extortion.