26,620 tonnes of coal for Rampal power plant reaches Mongla
A Chinese-flagged ship carrying 26,620 tonnes of coal for Rampal Thermal Power Plant in Bagerhat has arrived at Mongla port.
The coal-carrying ship reached Harbaria of the port at 5:00 am today, said Khandaker Reazul Haque, assistant manager of Togi Shipping and Logistics Limited Khulna, the local shipping agent of the ship MV J Hai.
At present, the unloading and transporting activities are going on.
The ship left Indonesia for Mongla port on May 21.
Comments