The construction of the third terminal of the Hazrat Shahjalal International Airport in the capital is going on in full swing. A passenger terminal building, roads, an airport apron, a parking lot, a cargo complex, and other structures are being built under the Tk 21,399 crore project. The terminal is likely to be opened by October next year. Photo: Sk Enamul Haq
Hundreds of farmers at Purangram village in Manikganj’s Ghior upazila are being affected after a company illegally erected structures on an irrigation canal beside Manikganj-Tangail road. The photo was taken recently. Photo: Zahangir Shah
Underprivileged children don’t get fair chances in life. They are left with poor playing options. This picture taken recently in the capital’s Bangla Motor area shows two children, away from their home, playing on the sidewalk with a fallen branch of a tree. Photo: Prabir Das