Import and export activities resumed at sea and land ports across the country yesterday after revenue officials called off their two-day nationwide shutdown on Sunday evening.
Operations have resumed, including both import and export activities
Without proper oversight, even foreign operators fail to deliver.
Although the National Board of Revenue (NBR) resumed regular operations yesterday after nearly two weeks of protests and work abstentions, ship and container congestion has once again gripped the Chattogram Port, triggering concern among businesses over potential delays in cargo handling and increased logistics costs.
The three-day blockade was called over the handover of the NCT to a foreign operator
Picture a crowded harbour where the salty seabreeze carries whispers of far-off lands, where merchants of all creed and caste haggle over silks and spices, and where towering ships of all varieties – Chinese junks, Arab dhows, and Portuguese carracks – sway gently in the waters of the Bay of Bengal.
About 2 lakh tonnes of imported goods left abandoned at Chattogram port alone for years
Container movement between the port and 21 private ICDs remains suspended since morning
The government is considering appointing some of the world’s most experienced port operators to manage Chattogram Port and other sea and land ports in the region, said Chief Adviser’s Press Secretary Shafiqul Alam yesterday.
Sabiha Saiki Fashion shipped 85 consignments worth Tk 22 crore through Ctg port in the last three years using fake documents
Imports through Chattogram port fell 2.5 per cent year-on-year in the first six months of the current fiscal as rising US dollar prices pushed up the overall costs involved, according to traders.
Readymade garment manufacturer A Plus Sweater Ltd had sent an RMG consignment to Chattogram Port from its Gazipur factory on eight covered vans on October 29 last year for shipment to Brazil.
A vessel with 10 metres draught berthed at a jetty of the Chattogram port for the first time yesterday, a major leap forward as the movement of larger ships is expected to cut costs and save time.
The Mongla Port Authority’s plan to undertake a massive development work to expand, modernise and build the capacity of the port has received a major boost as uncertainty over funding is set to disappear.
The state coffers were robbed of Tk 258 crore for 26 counts of irregularities by the Chattogram Port Authority between fiscal 2017-18 and 2019-20, found the Comptroller and Auditor General (CAG).
At least three import consignments were released without inspection from the Chattogram Port using the login credentials of a top customs official in June-July despite the recent measures taken to thwart such cons that cost the state coffer in unpaid duties and taxes.
Water transport workers went on an indefinite countrywide work abstention from 12:01am today demanding an increase in minimum monthly wage.
All the vessels anchored at the jetties and the outer anchorage of Chattogram port are being sent to the deeper sea by this afternoon (October 24, 2022) as safety measure ahead of approaching cyclone Sitrang.
The Chattogram port must fast-track the unloading of goods, install modern equipment, and improve service quality in order to cut congestion and facilitate Bangladesh’s fast-expanding global trade, speakers said today.