"This occurred as part of the automatic protection system of the grid"
According to the Power Grid Bangladesh PLC, the situation has since returned to normal
Water supply in different areas of the Chattogram city was disrupted for around 10 hours yesterday due to a crack in the pipeline in Najumia Hat area under Hathazari upazila of the district.
Gas supply will remain suspended for 10 hours tomorrow in different areas in the capital for emergency works in gas pipeline
Frequent power cuts over the last week have left residents of Chattogram suffering.
Gas supply will remain suspended in different areas of the capital from 10:00am to 6:00pm tomorrow due to gas pipeline replacement works
Dhaka South City Corporation today seized equipment, belonging to Dhaka Wasa, used for digging work at Lalbagh near Shaheed Abdul Alim playground
Gas supply will remain suspended in different areas of the capital from 10:00am to 6:00pm tomorrow due to pipeline replacement works
Police arrested two people in Rajshahi’s Tanore upazila yesterday night (April 7) while protesting load-shedding.
After four days of disruption, the Chevron-operated Bibiyana gas field resumed full production from this morning – which is likely to end the gas crisis in parts of Bangladesh.
The Bibiyana gas field may add 70 million cubic feet of gas per day (MMCFD) by tomorrow morning to further ease the nagging gas crisis in the capital.
Dhaka Wasa managing director said he gets foul-smelling tap water at home too but assured that it was harmless.
Managing Director of Dhaka Water Supply and Sewerage Authority (Wasa) Taqsem A Khan today asked residents of the city to boil supplied water before drinking it.
For the second day in a row, many neighbourhoods in the capital suffered an acute gas crisis yesterday, as the authorities struggled to fix the technical problems that occurred at Bibiyana Gas Field in Sylhet on Sunday.
Protesting frequent load shedding, a group of angry locals, including students, besieged the Zonal Office of Mymensingh Palli Bidyut Samity-1 at Madhupur upazila in Tangail today.
Like yesterday, the first day of Ramadan, there is a possibility of limited gay supply in Dhaka and surrounding areas today.
Consumers will have to buy Liquefied Petroleum Gas (LPG) at a higher price as Bangladesh Energy Regulatory Commission (BERC) has re-fixed the price of 12 KG LPG cylinder at Tk 1,439 from the existing Tk 1,391 with effect from 6 pm today.
The managing director (MD) of Chattogram Water Supply and Sewerage Authority (CWASA), AKM Fazlullah, has withdrawn his proposal to increase his basic salary from Tk 1.80 lakh to Tk 4.50 lakh.